Plant 51

This multi-unit building utilized pre-fabbed panel structures manufactured off-site, which were erected on the job site.  The project was a historical building where the exterior walls had to remain in tact with no modifications. This made blending the interior walls to the existing exterior wall very challenging.

  • Plant 51, San Jose, CA
  • Daley’s Contract $13.5M
  • Devcon Construction
  • Completed 2008